Concrete services in Fort Collins by Stormheart Construction? In addition to causing expensive damage to municipal infrastructure, hitting utility lines when digging can also cause electrocution and natural gas leaks,which can lead to worker fatalities. Fortunately, you can easily avoid hitting utility lines by contacting your local utility companies before you dig. Simply call your local 811 agency and allow the required time for the utility companies to mark their lines. Not only will this keep your crew safe, but this will help to prevent your company from being fined since digging without calling is illegal in many states.
No matter how organised or experienced you are, renovating is a stressful and time consuming process, so unless a project is guaranteed to give you either your dream home, or make you money, you are taking on the wrong property. You want to renovate, not rebuild. At auction, novice investors sometimes ‘buy blind’. But more experienced and savvy builders will often commission a preliminary survey to flag up hidden dangers, defects and structural botches, works where consent should have been obtained (but may not have been), as well as location risks such as obscure rights of way, flooding and radon.
Accidents involving construction vehicles, such as dump trucks or backhoe loaders, are a common hazard of trenching sites. Mobile equipment operators might have an obstructed view and therefore not be able to detect when they are approaching the perimeter of the trench. OSHA suggests that a spotter or a flagger be designated to direct the mobile equipment operator and prevent the vehicle from falling in the trench. When material is being loaded or unloaded from the construction vehicle, workers should be required to stand back in order to prevent being hit by flying debris. Read additional details at Demolition services Fort Collins.
Why you should split blocks for a rough finish. If the end of a block will be visible, and you’d like it to match the other rough surfaces, use a block splitter. You can probably rent a splitter like this for less than $100 per day. Use a gas-powered cutoff saw like this one for a smooth cut. This saw can cut with or without water. Water eliminates the dust but creates a messy slurry that can permanently stain surfaces like driveways and sidewalks. You can rent a saw like this for about $80 per day. If you don’t use water, make sure the dust doesn’t blow into the house or on a neighbor’s house.DON’T lay blocks on an unlevel surface. The first course (or row of blocks) sets the stage for the rest of the wall, so it’s vital that you make it perfectly level. If it isn’t, subsequent rows won’t be level either, resulting in a retaining wall that’s lopsided and unattractive. Use a four-foot carpenter’s level to ensure that the gravel layer below the first course of blocks is level before you start setting the blocks. Any discrepancies here will show up higher in the wall. DO stack blocks at a slight backward slope.
If the block Retaining wall is more substantial as in a metre high or more then the fence would have to be behind the wall instead of through or on top. Most Segmental Retaining Wall blocks do not have a big enough cavity or void for the fence post to be directly concreted inside them and would lack the strength to hold the weight of a fence. Generally, most walls are built using an aggregate (Gravel) backfill or in some circumstances No Fines Concrete (NFC). Because of this, an allowance has to be made for the fence post at the early construction stage such as installing PVC Piping as a sleave for the fence post to fit into, this would require some forethought and good planning. See additional information at https://stormheart.net/.