Kingstone retaining wall building in Colorado: Get the first course right. Use a torpedo level to level each block front to back and either a 4-foot or 6-foot level to keep each course level and even. Set the blocks with a heavy rubber or plastic mallet. Getting the first course flat and level is extremely important, so take your time. Try to lay the course as close to the center of the trench as possible. Even a small pebble on the surface of a block will throw the one above it out of alignment. And that crooked block will affect the one above it, and so on. That little stone could eventually create an unattractive hump in the top course.
Ensure you order everything you need at once and set aside an allowance for breakages and cutting. Contrary to popular belief, building a fence on top or behind a Block Retaining wall is rather easy. In some cases where only a small amount of retaining is required as in 200-400mm, the fence can be built directly on top of the wall with the fence posts passing through the walling blocks and concreted into the ground as normal. This method would be ok to use with all forms of fencing such as post and rail, colour bond post and rail, good neighbour fencing, tubular panel and even pool fencing.
We also repair existing retaining walls. Many railroad tie walls or older concrete retaining walls which may or may not include rocks or boulders are beginning to show signs of failure. Often times a homeowner will build a DIY retaining wall that needs help after years of service. We serve all of Colorado out of our home office in Colorado Springs. Please feel free to reach out to us with any questions you may have. Estimates are always free and everything we touch comes with a warranty. Discover additional details at Best Retaining Walls Colorado.
After mixing your concrete, pour the wall in horizontal layers of not more than 20 inches, beginning at the ends and moving toward the center. Use a ramp to wheel the concrete into position and a splashboard to direct the pour and control spillage. Remove the spacers as you go, and work the concrete against the sides of the form and around the reinforcement as each layer is poured. Pour layers as soon after the previous one as possible to avoid cold (non-bonded) joints, which cause leaks. Strike off the concrete flush with the top of the form, and then trowel it to the desired finish. Insert anchor bolts for mud sills and wooden caps once the concrete has set sufficiently to hold them. Because of the pressure created by the slope of the lawn, cure the concrete for at least seven days before removing the forms.
DON’T forget to allow for drainage. Groundwater is the natural enemy of retaining walls. When it saturates clay-type soils, they swell and put excessive pressure on the backside of the wall. To avoid failure, make drainage provisions at the same time as you go about building the retaining wall. Backfilling the space behind the blocks with crushed stone and then installing a flexible perforated drainpipe (available at The Home Depot), also called “drain tile,” at the base of the wall could create the necessary escape route for groundwater. The perforated pipe will carry groundwater to each end of the wall where it can drain harmlessly away. The ends of the drainpipe should then exit on each end of the wall, and you may cover them with crushed stone to camouflage their appearance.